Speedzilla Forums banner
1 - 20 of 20 Posts

· Can Afford To Be Critical
Joined
·
1,852 Posts
I know this guy. As a matter of fact, I'll be over by his place later tonight. I'll pass on your kind words.

VERY unassuming, VERY talented. Kinda the polar opposite of the Teutles.

BTW, the Tom Mellor he refers to in the "thanks to" section has a couple of Bonneville records on a .....Bonneville.
 

· Senior Member
Joined
·
2,737 Posts
Superb work. I can empathize with him on the sheer time it takes to design and build equipment. Bringing it to life makes it all worth it. As time goes on he'll likely revise every part until it is perfect.
 

· lidzduc.blogspot.com
Joined
·
3,578 Posts
Fantastic!!
I found this statement interesting-
<Q>
The finished hub. At this point I've worked on the Excelsior project slightly more than a year. How those guys at West Cost Chopper can build an entire bike in 4 to 5 days is absolutely amazing. I take my hat off to them.<Q>
I hope it was meant as a joke!:woot:
 
1 - 20 of 20 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top